Project Overview

Client

Highlands & Islands Enterprise

Designer / Consultancy

Fairhurst

Construction Period

November 2018 – July 2019

Budget

£3m

Project Overview

Works involved the Design & Build of a new bus/pedestrian/cycle link from Inverness Campus to Inverness Retail Park comprising a 30m single span bridge over the Inverness to Perth railway with associated link road, footpaths and services.

Key Numbers

  • 30m single span concrete bridge
  • 3000m3 of topsoil strip
  • 2000m3 of sub formation
  • 430m of drainage pipes
  • 4000m2 Bitumen paving
  • 1200m of concrete kerbing
  • Modification to the existing road configuration at A96 Inverness Centre
  • Modification to the existing distributor road serving the site
  • Upgrade of existing water main and foul sewer networks
  • Installation of numerous other utilities and services
  • Construction of bus & cycle road/bridge and shared use path
  • Installation of road signage