Client
Energia
Designer / Consultancy
Malachy Walsh & Partners
Construction Period
July 2023 – August 2024
PSCS: July 2023 – Ongoing
Budget
€5-10m
Project Overview
Crossmore Wind Farm project in Co. Clare includes the installation of seven 3.6 MW turbines with a tip height of 125m. The scope covers turbine base installation, crane hardstands, 5 km of access tracks, road upgrades, drainage systems, and electrical ducting, along with forestry clearance and environmental protection measures to minimize aquatic impact.
Key Numbers
- 7 Enercon E-115 EP3 E3 turbines (3.6 MW each)
- 38kV Substation sub-station platform
- 5km of access tracks
- 1ha of forestry cleared
- 3000m³ of concrete for turbine foundations
- 5km of open cut ducting
- 6km of road widening and strengthening to local road
- 10m long bottomless culvert (installed without impacting EPA 1st order stream)
- Various Street furniture upgrades on primary and national routes from Port of Galway to site, and Foynes Port to Site
- Attendance on 42 turbine component deliveries