Client
Scottish Power
Designer / Consultancy
RPS
Construction Period
14 months
Budget
£5-10m range

Project Overview
Works involved the Design & Build of civil and electrical infrastructure to allow installation of 16 wind turbines (11x ECO80s and 5x ECO100s) and electrical works (testing and commissioning) of the 16 turbines following installation by the Turbine Contractor.
Key Numbers
- 5x ECO100 (630m³ of concrete per base)
- 11x ECO80s (350m³ of concrete per base)
- 9km of new forestry access road construction
- 3km of renewal/realignment of existing forestry access roads
- 15km of ducting and cabling
- 4000m³ of peat excavation per base
- 8000m of 33KV power cable and fibre option cable installation
- 900t of steel reinforcement
- 7000m³ of structural concrete
- 90,000m² of geogrid
- 98,000m³ imported rock fill