Project Overview

Client

Green Power

Designer / Consultancy

N/A

Construction Period

August 2017 – May 2018

Budget

£2-5m

Project Overview

Located in Argyll and Bute near Kilchrenan on the West Coast of Scotland – a remedial works project to a constructed 20km length of forestry road servicing a windfarm and forestry operations in the area.

Key Numbers

  • 6km of forest road surfacing
  • 100m of new core path
  • 40,000m3 excavation (5000m3 of peat used for landscaping)
  • Construction of 3 reinforced concrete bridges (480m3 concrete)
  • 5x 11m length pre-cast beams to each bridge
  • 3 culverts (10-35m)
  • Replacement of 25 culverts (450-2400mm, 1-10m depth)
  • 12km of road edge drainage ditch works completed
  • Significant logistic planning carried out due to site length
  • A number of seasonal ecological restrictions in place during the contract period including exclusion zones.