Project Overview

Client

South Lanarkshire Council

Construction Period

12 months

Budget

£2.5m

Project Overview

The works involved a new 4-arm 48m ICD roundabout at the junction of Westburn Road, Westburn Drive and Westburn Farm Road, Cambuslang along with associated link roads.

The works incorporated a new 3m wide shared cycleway/footway on all arms of the roundabout. In addition to carriageway and footway construction the works include earthworks, drainage, road lighting and landscaping.

Key Numbers

  • Excavation of 5250m3 of unsuitable material
  • Disposal of 5260m3 of unsuitable material
  • Import 750t 8” x 4” capping
  • Import 2700t 6F4 capping
  • Import 3500t Type 1
  • 4552m2 of flexible composite paving
  • 865m2 cold milling
  • 2250m2 footpath paving
  • 450m of drainage pipes
  • 563m narrow filter drains
  • 24x streetlights installed
  • 2x Haldo Pillars installed