Client
Dublin Port Company
Designer / Consultancy
DBFL Consulting Engineers
Construction Period
September 2024 – Ongoing
Budget
€10-15m

Project Overview
This project included the installation of reinforced concrete (RC) retaining walls and new bituminous pavement. A surface water network was established, along with power and communications infrastructure. A new watermain was installed, featuring 30m high mast lighting columns and 12m public lighting columns.
Key Numbers
- Excavation for Walls – 1670m3
- Excavation for Ramps = 664m3
- Trench Arisings = 3023m3
- Chambers, etc. = 1250m3
- Concrete Elements (yards, kerbs, etc.) = 900m3