Project Overview

Client

Dublin Port Company

Designer / Consultancy

DBFL Consulting Engineers

Construction Period

September 2024 – Ongoing

Budget

€10-15m

Project Overview

This project included the installation of reinforced concrete (RC) retaining walls and new bituminous pavement. A surface water network was established, along with power and communications infrastructure. A new watermain was installed, featuring 30m high mast lighting columns and 12m public lighting columns.

Key Numbers

  • Excavation for Walls – 1670m3
  • Excavation for Ramps = 664m3
  • Trench Arisings = 3023m3
  • Chambers, etc. = 1250m3
  • Concrete Elements (yards, kerbs, etc.) = 900m3