Client
Electricity Supply Board (ESB)
Designer / Consultancy
Gavin & Doherty Geosolutions (GDG)
Construction Period
January 2024 – April 2024
Budget
€1-5m
Project Overview
The Middleton House Solar Farm project in County Longford consists of two combined solar farm developments, Middleton House and Bunacloy, with a total area of approximately 85.92 hectares. This project includes the construction of a TII-compliant entrance, access tracks, bridge structures, culverts, and passing bays, all designed with careful environmental and ecological considerations with regards to existing 3no. Badger Setts, Wintering and Breeding Birds.
Key Numbers
- 85.92 hectares total project site area
- 2.6km of 3.5m wide access tracks
- 3 box culverts installed
- 4 piped culverts
- 1 Section 50 compliant bridge for water crossing
- Compliance with ecological and archaeological requirements