Client
Transport Scotland
Designer / Consultancy
Atkins
Construction Period
October 2015 – December 2017
Budget
£35m

Project Overview
The first project in the crucial A9 Dualling Scheme – Kincraig to Dalraddy involved the design, construction, completion and maintenance of 7.5km dual carriageway trunk road widening through the Cairngorms National Park – an area of ecological and environmental significance.
Key Numbers
- 7.5km of online dualling of an existing single carriageway to dual carriageway standard
- 11km of accommodation tracks between 2m and 4m
- 7km of Non-Motorised User tracks
- 8 primary bridge structures including 2 road and river bridges
- 7 secondary bridge structures
- 15,000m of filter drains
- 60,497m3 of topsoil strip