Client
Devon County Council
Designer / Consultancy
Engineering Design Group
Construction Period
17 months
Budget
£6m
Project Overview
The project comprises of approximately 1.2km of carriageway construction, including associated drainage, structure and footway works. Construction of approximately 14,000m2 of carriageway, along with associated earthworks, drainage, safety barrier, traffic signs, road markings and street lighting.
Key Numbers
- 5900m3 of topsoil strip excavation
- 7000m3 of subsoil strip excavation
- 5500m3 of clay suitable material excavation
- 350m3 of sandy unsuitable material excavation
- 2x HDPE pipe drainage culvert structures
- 13,200m2 of flexible pavement
- 1416m of post and rail fencing
- 800m footways and cycleways
- 3500m of road markings
- 680m VRS barrier
- 303m of narrow filter drains
- 1756m of carrier drainage pipes
- 7x utility diversions