Client
Sundew (Bord na Mona and ESB JV) / Voltalia
Designer / Consultancy
Gavin & Doherty Geosolutions
Construction Period
July 2023 – late 2024
Budget
€10-20m

Project Overview
The Timahoe North Solar Farm project involved 3.3 km of access track, 11 km of floating roadways, and site clearance across 156 hectares. The project also featured the installation of 62,500 sigma piles in soft ground, along with the construction of an attenuation tank, substation foundations, and infrastructure.
Key Numbers
- Access Track: 3.3 km
- Floating Road Access Tracks: 11 km
- Peat Removed: 30,000 m³
- Sigma Piles Installed: 62,500
- ESBN Ducting Installed: 1.35 km
- Irish Watermain Installed: 1.3 km