Project Overview

Client

Fife Council

Construction Period

Jan 2018 – April 2019

Budget

£1.5m

Project Overview

The project was in Leven town centre and involved streetscape improvements to Bridge St; North Street; Branch Street; Shorehead Road and adjoining car park.

Works included demolition and removal of the existing sidewalks and then replacing with newly paved sidewalks along with the resurfacing of the above roads.

As part of this project Wills Bros were contracted to design, supply and install a paving slab which incorporated the Leven Seal (Crest). Fortunately, Wills Bros were able to source the expertise and requisite materials locally, the designer and manufacturer was located within the works area.

Key Numbers

  • 1000m3 of demolition, excavation and disposal of sidewalks
  • 410m3 of concrete sublayer
  • 1000m of kerbing
  • 220m of streetlight ducting
  • 2700m2 of hardscape paving and grouting
  • 2400m2 of blacktop regulating and surfacing